COMMERCIAL SOLUTIONS
Four systems, configured as
one.
Solar, battery, EV charging and electrical, designed against the same interval data so each one makes the others work harder. Start anywhere below.
01 · COMMERCIAL SOLAR
Solar.
Generation sized to your load, priced on the return it
delivers.
Rooftop, ground-mount and carport arrays for commercial sites, up to 1 MW. For a decade the category
sized systems to fit the rebate; we size them to fit your load, because an oversized array exports for
cents what an undersized one buys back for dollars.
It suits any site with daytime consumption and idle roof — warehousing, manufacturing, retail, offices, agriculture. If your operation runs while the sun is up, the roof is capital that isn't working yet.
Delivery starts with your interval data and tariff structure, not a brochure. Design is checked against roof, switchboard and grid connection before you commit to anything, and the proposal is fixed-price with payback modelling built on your actual consumption. From 1 October, STCs scale to 1 MW — around 20% off at the point of sale, with the rate held through 2030.
Rooftop, ground-mount, carport
Whichever the site supports — or combination.
Sized from interval data
Not from roof area, and not from a rebate threshold.
Fixed pricing, payback modelled
Assumptions shown, not a placeholder figure that changes later.
Monitoring & analytics
Generation tracked from day one, so performance is provable.
Financing incl. PPA
Purchase, lease or PPA, modelled against your numbers. Compliance handled end to end.

02 · BATTERY STORAGE
Battery.
Storage that makes your worst fifteen minutes cost nothing worth mentioning.
Your retailer sets your rate on your worst fifteen minutes of the month. A battery sized from your actual
interval data flattens those peaks, shifts solar into the evening, and holds critical loads through outages
where required.
It suits sites paying demand charges, sites with solar already exporting for little, and operations that can't afford to stop when the grid does. The economics have moved: NSW's PDRS opened to commercial batteries on 1 September, and the federal battery discount stacks on eligible systems up to 100 kWh.
We model your site under every scheme you're eligible for — BESS 4 or BESS 5, plus any stackable federal incentive — and you get a number you can take to the board, whether or not you take it to us. Hardware is CEC-listed, and installation is to AS/NZS 5139 by SAA-accredited installers.
Sized from your interval data
Not a brochure template — generic figures are guesses.
Targets demand charges
And shifts your solar into the evening peak.
Modelled under every scheme
BESS 4 / BESS 5, plus stackable federal incentives.
Backup for critical loads
Where the site needs to ride through outages.
Installed to AS/NZS 5139
By SAA-accredited installers, with CEC-listed hardware.

03 · EV CHARGING
EV charging.
Charging that scales with your vehicles, not against your grid connection.
Fleet and workplace charging, AC and DC, load-managed from day one. The expensive mistake in
commercial EV charging isn't the chargers — it's the network upgrade a site triggers when chargers are added without load management. We design around your connection so the chargers share capacity intelligently instead of demanding more of it.
It suits fleets electrifying on a schedule, workplaces offering staff charging, and body corporates getting ahead of resident demand.
Delivery starts with a load assessment from your interval data, then hardware selection, access control and billing configured for how the site actually operates — staff, fleet and visitors treated differently where they should be. Cabling is sized for the chargers you'll add later, not just the ones going in now, so the second phase doesn't mean trenching twice.
Fleet & workplace, AC and DC
From wall-mounted AC to DC fast charging.
Load-managed from day one
No surprise network upgrades.
Scales with the fleet
Cabled and configured for the chargers you'll add later.
Billing & access control
Staff, fleet and visitors, each handled properly.
Pairs with solar & battery
Charge vehicles on generation you already own.

04 · ELECTRICAL SERVICES
Electrical.
The switchboard work everything else depends on.
Three-phase power, switchboard upgrades and compliance work built for commercial load — from
emergency repairs to full facility upgrades. Every solar array, battery and charger on this page connects
through a switchboard, and an aging board is where good energy projects go to stall.
It suits sites adding electrical load, sites whose boards predate their current operation, and anyone who
has had a project delayed by a defect notice they didn't see coming.
Because the same team delivers our energy projects, electrical scope is coordinated rather than
discovered: board capacity, protection and compliance are assessed in the feasibility stage, so the
upgrade lands in the project plan instead of the variations column. Licensed in both target states — VIC
REC 38337 and NSW REC 498754C.
Three-phase & switchboards
Upgrades built for commercial load.
Compliance & certification
Defect rectification handled, not left for you to chase.
Emergency to full upgrade
Repairs today, facility upgrades on a plan.
Coordinated with energy scope
Assessed at feasibility, not discovered at install.
VIC REC 38337 · NSW REC 498754C.
By SAA-accredited installers, with CEC-listed hardware.

Next step
Ready to see your number?
We pull your interval data, model the site under every scheme you're eligible for, and you get a number you can take to the board — whether or not you take it to us.
