Commercial Solar & Battery

Your roof is worth about 20% more from 1 October.
We'll show you the number.

The federal solar discount scales to 1 MW on 1 October. The battery discount is already live. We model your site under both — solar, battery, EV charging and electrical, up to 300 kWh.

Since 2011

In the field across commercial & industrial energy

1,500+ systems

Delivered across Victoria & NSW

Australian owned

One local point of contact, no call centre

Who we build with.

Tier 1 componentry, so every system carries manufacturer warranties as well as our own.

What we configure

Four systems. One accountable team.

Designed, installed and supported in-house, from energy data to grid connection.

Commercial Solar

Rooftop and ground-mount, sized to your load, not your roof space. Fixed pricing with payback modelling included.

Battery Storage

Configured to target demand charges, not just your daytime bill. Sized from your interval data, not a generic figure.

EV Charging

Fleet and workplace charging that scales with your vehicles, not against your grid connection. Load-managed from day one.

Electrical Services

Three-phase power, switchboards and compliance work built for commercial load. Emergency repairs to full facility upgrades.

Federal & NSW incentives

What it's worth.

The schemes are open. Most eligible businesses still haven't heard of them. That's the gap this page closes.

Federal · Solar

≈ 20% off

At the point of sale, solar to 1 MW

STCs scale from 100 kW to 1 MW on 1 October. The rate is held through 2030, so it doesn't step down while you plan.

*Figures current October 2026

Federal · Battery

5–100 kWh

Discounted upfront, live now

The CHB Program discounts the first 50 kWh of usable capacity. Must pair with new or existing solar — add both to one project and the two discounts land together.

*Figures current October 2026

NSW · PDRS BESS 4

~$65,800

200 kWh battery with 100 kW solar

Modelled incentive under BESS 4, open since 1 September. Payback drops from 7 years to 3.8. Battery-only: ~$44,100.

*Figures current October 2026

Government modelling at a PRC price of $3.50 (GST inclusive); certificate prices fluctuate and are not guaranteed. Yours depend on your load profile — which is why generic figures are guesses and a feasibility assessment isn't.

Why Off The Grid

One team, accountable start to finish.

In the field since 2011. Licensed in both target states. We design, install and support what we build — and the person who answers the phone works here.

OffTheGridInstall

End-to-end delivery

From energy data to grid connection: assessment, configuration, installation, compliance and commissioning, all in-house.

Flexible funding

Buy outright, lease it, or run it as a PPA. We model each option against your numbers so you choose the structure that suits your balance sheet, not ours.

Ongoing performance

Remote monitoring, maintenance agreements and proactive diagnostics keep the system earning its keep long after installation day.

Accountability

Australian owned and operated, with one local point of contact for your project. No call centre, no subcontracted disappearing act.

The team

The people who answer the phone.

The team that models your site is the team that builds it — and the one you call afterwards.

Mattai Touma
Mattai Touma
Co-Director
Adrian Zagaglioni
Adrian Zagaglioni
Co-Director
Will Tinetti
Will Tinetti
Head of Commercial Sales
Katrina Zagaglioni
Katrina Zagaglioni
Senior Coordinator
Meet Patel
Meet Patel
Consulting Engineer
Mitchell Bailey
Mitchell Bailey
Head of Data & Digital Operations
Syed Saad
Syed Saad
Technical Delivery Lead

Our process

What happens after you book.

From your first data pull to years after handover. Eight steps, one team, accountable start to finish.

01

Energy data analysis

We pull your interval data and tariff structure before we talk about equipment.

02

Feasibility study

Roof, switchboard, grid connection and load, assessed before you commit to anything.

03

Pre-sale engineering

Components, capacity and layout confirmed against your site conditions and compliance.

04

Proposal & finance

A fixed-price proposal with payback modelling — purchase, lease or PPA — before you sign.

05

Project management

One team coordinates the entire build, so your operations keep running.

06

QA & commissioning

Every system tested against its specification before handover, not after a complaint.

07

Handover & monitoring

Documentation, compliance certificates and monitoring access, delivered on day one.

08

Ongoing support

Remote monitoring and a local team who respond, not a support queue.

In the field since 2011 · VIC 38337 · NSW 498754C

Sectors

Where we work.

Anywhere the bill has a demand charge and the roof has room. Systems are sized to each site's interval data, so the sector matters less than the load profile.

FAQ

What buyers ask before they sign.

Anything not covered here gets answered in the assessment — with your data, not an industry average.

Which rebates is my site eligible for?

Depends on your state, battery size and whether new solar is added. NSW's PDRS opened to commercial batteries on 1 September, the federal battery discount is already live, and solar STCs scale to 1 MW from 1 October. The assessment models every scheme you're eligible for.

What does a commercial energy system actually cost?

It depends on your site, your load and which of solar, battery, EV charging or electrical work you need, so we don't quote a number until we've seen your data. What you get before any commitment is a fixed-price proposal with the assumptions shown, not a placeholder figure that changes later.

How long until it pays for itself?

Payback depends on your tariff structure, demand charges and how the system is financed. Every proposal includes payback modelling built on your actual consumption, not an industry average.

What permits and approvals are involved?

Grid connection approval, compliance certification and any council requirements are handled as part of the project, coordinated by our team rather than left for you to chase.

Can we finance it instead of paying upfront?

Yes. Purchase, equipment finance, lease-to-own and PPA structures are all available, and we'll model each one against your numbers so the comparison is real.

Next step

Ready to see your number?

We pull your interval data, model the site under every scheme you're eligible for, and you get a number you can take to the board — whether or not you take it to us.